Laserfiche WebLink
TABLE 23-4-1 <br />REVEGETATION BONDING SUMMARY - HAY DEN GULCH LOADOUT <br />Assume 102.3 acres to revegetate. <br />Operation Acres Cost/Ac Total <br /> <br />1. Seedbed Preparation 102,3 33.15* 3,391.25 <br />2. Drill Seed Mix 1 55,0 112.30 6,176.50 <br />3. Drill Seed MSx 2 2,4 94.30 226.32 <br />4. Drill Seed Mix 3 42.9 161.30 6r 919.77 <br />5. Hyd roseed Seed Mix 3 2.0 720,00 1,490.00 <br />6, Hydro Mulch 2.0 ~ 950,00 1,900.00 <br />7, Fertilizer 102.3 18.50 1,892.55 <br />8. Straw Mulching 100.3 200,00 20,060.00 <br />S 42,006.39 <br />Assume 208 Stand Retreatement 8,401.28 <br />9 50,407.67 <br />Fencing @ 51.65/ft x one mile 8,712.00 <br />S 59,119.67 <br />or S 59,120.00 <br />`Discing only. Harrowing is extremely poor reclamation practice. Reduces soil structure <br />further and can increase chances for erosion. <br />'r l1 <br />u <br />/hK-oy <br />23-4-1 Revised 01/30/96 <br />