Laserfiche WebLink
<br />RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTNNORK - STREAK CHANNEL RECONSTRUCTION <br />Task No.~ Tesk Description ~ Cost (f) <br />Subtotal (X): <br />____________ <br />I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Tesk No.~ Task Description ~ Cost (f) <br />Subtotal (I): <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cost (f) <br />2 I 8"TOPSOIL PLACEMENT I f2,663 <br />Subtotal (J): 52,663 <br />