Laserfiche WebLink
I • TAB 12 <br />TABLE OF CONTENTS <br /> <br />Introduction 1 <br />Mining Operations -Life-of-Operations 1 <br />Operation Description -General 6 <br />Operation Description -Permit Area 8 <br />First Permit Term 8 <br />Second Permit Tetm 8 <br />Thitd Permit Term (August 2005-August 2010) 9 <br />Potentially Unstable and Active Landslide Areas 10 <br />Coal Resource Protection and Conservation ]3 <br />LIST OF TABLES <br />• Tab No. P4ee <br />12-1 Major Mining and Reclamation Equipment 4 <br />12-2 Annual Coal Production 6 <br />LIST OF FIGURES <br />Fjgure No. Pa~Ee <br />12-1 Coal Recovery Areas 7 <br />LIST OF ATTACI IMENTS <br />Attachment No. <br />12-1 Auger Mining <br />12-2 Highwall Mining <br />12-3 Highwall Mining Ground Control Plan <br />LIST OF EXHIBITS <br />Exhibit No. <br />• 12-1 Operations Plan -Mining <br />]2-lA Operations Plan -Topsoil Removal <br />PR-02 i Revised 10/05 <br />