My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE117906
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE117906
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:13:37 PM
Creation date
11/25/2007 4:30:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001068
IBM Index Class Name
Permit File
Doc Name
FAX COVER
From
DMG
To
JOE GAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 07/30/2001 <br />User : BMK <br />Agency or organization name : DMG <br />Permit or other job action :APPLY 6" OF TOPSOIL TO 10 ACRES <br />Task description :APPLY 6" OF TOPSOIL <br />State :Colorado <br />County :Las Animas <br />Site :Bottomless Pit <br />Basic machine :Cat D8R - 8U <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br /> Utilization <br />Ownership cosUhour : $49.76 NA <br />Operating cosUhour : $66.26 100 <br />Ripper op. cosUhour : $3.75 50 <br />Operator cost/hour : $27.99 NA <br />Total unitcosUhour : $147.76 Total fleetcosUhour <br />5147.76 <br />Swell Loose <br />CCY factor : 1.215 volume : 13,365 LCY <br />Source of estimated volume :EXHIBIT L <br />Source of estimated swell factor :EXHIBIT L <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 1 1, 000 <br />HOURLY PRODUCTION <br />Average push distance : 250 feet <br />Unadjusted hourly production : 400.0 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 2.00 % (neg) <br />Average site altitude : 5,900 feet <br />Material weight : 1,600 Ibs/LCY <br />Weight description <br />Top Soil <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.457 /LCY <br />Job Condition Correction Factors Source <br />Operator skill : 0.75 (avg.) <br />Material consistency : 0.90 (Cat HE <br />Dozing method : 1.20 (slot) <br />Visibility: 1.00 (avg.) <br />Job efficiency : 0.83 (lshilt/ds <br />Spoil pile : 0.80 (/nd-d) <br />Push gradient : 1.05 (Cat H6 <br />Altitude : 1.00 (Cat H6 <br />Material weight : 1.44 (Cat H6 <br />Blade type : 1.00 (S/SU/L <br />Net correction : 0.81 <br />Adjusted unit production : 323.46 LCY/hr <br />Adjusted fleet production : 323.46 LCY/hr <br />PermiVjob# : M-2001-068 <br />Abbreviation :none <br />Filename : M068-002 <br />Total job time : 41.32 Hours <br />Total job cost : $6,105 <br />Horsepower: 305 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.