My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE117906
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE117906
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:13:37 PM
Creation date
11/25/2007 4:30:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001068
IBM Index Class Name
Permit File
Doc Name
FAX COVER
From
DMG
To
JOE GAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating_Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 30-Jul-2007 <br />User : BMK <br />Permit or job no.: M-2001-068 <br />Abbreviation : none <br />Site :Bottomless Pit <br />State :Colorado <br />County :Las Animas <br />Filename : M068-000 <br />Agency or organization name : DMG <br />Permit or job action :NEW PERMIT <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />001 -ROUGH GRADE 10 ACRES dozer 1 62.2 $9.200 <br />002 -APPLY 6" OF TOPSOIL TO 10 ACRES dozer 1 41.3 $6,105 <br />003 -REVEGETATEfOACRES revege 1 50.0 $12,896 <br />004 -MOB/DEMOB mobilize 1 10.0 $500 <br />005 -WEED CONTROL NA 1 20.0 $300 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />suerorALS: 183.5 $29,001 <br />' includes inflation factor adjustment of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - <br />NA <br />Liability insurance <br />Performance bond <br />Job superintendent <br />Profit <br />1.55 <br />1.05 <br />96.79 <br />10.00 <br />TOTAL DIRECT COST'= $30,501 <br />o(direct total = $473 <br />of direct total = $320 <br />hrs'...$/hr $33.50 total = $3,242 <br />of direct total = $3,050 <br />'assume net hours = 50°0 0l task hours TOTAL O 8 P = $7, 086 <br /> CONTRACT AMOUNT (direct + O 8 P) _ $37,587 <br />PROJECT MANAGEMENT- <br />Engineering work and/or contracUbid preparation : 4.25 %o of cntr. NA total = $1,597 <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $1,879 <br />coNnNCENCV- NA' NA total= NA <br />' con(ingencies accounted for al task level TOTAL INDIRECT COST = $10,562 <br /> TOTAL BOND AMOUNT (direct + indirect) = 541,063 <br />
The URL can be used to link to this page
Your browser does not support the video tag.