Laserfiche WebLink
Stipulation No. 3 <br />Pnor to discharge to the west through the <br />two roncrete box culverts or other culverts <br />under US Hwy 85 owned and operated by <br />CDOT, [he applicant wdl demonstrate [hat <br />thn, culverts can handle the Vows /rom any <br />lawful use by Ute applaant and [hat US Hwy <br />BS wul not be negatively impacted. The <br />apphcanl must nhta~n wntten consent from <br />CDOT la i1~>ihargc nilne water Into the <br />culverts i:nucr US Ihvy 8s prior to discharge <br />mtg IhVSC .: ~.Arr^ty. <br />No. 4 Con't <br />Inner, <br />No. 5 <br />Stipulation No. 4 <br />In ortler to matntaln phased bonding !or the Nay <br />Ilnor, the following permit condRwrss must be <br />lottovved: <br />r Tho applicnnt shall not mine Pond 2 below the <br />groundwater table unlit Pond [ is redalmed to two <br />leer above the groundwater 1evN. <br />. The apd~cant must beq~n constrursion of the slope <br />Imer no later than after two phases nave been <br />completely mined to bedrock. <br />r The maximum Ilnmr feet of Sbpe that may IM <br />drturbed and not reclaimed at any prven torte shall <br />be no graater tlun 6,000 lineal feet, <br />tipulation No. 4 Con't <br />The aDDi~cant shall subma and obtain approval <br />from tnc D+v~slon o} construction reports on Nay <br />I•ned S!06e5 that havC 6CCn [UmpICtCO in Older <br />to initiate the nez[ 6,000 tneai fact of mining. <br />Flnal release at the cWy bner must tx! obtained <br />from tha Office of the State Engineer In order far <br />the Dnls~on to rckasa any remaining <br />rcclamatan bond. <br />Stipulation No. 6 <br />Geoloq y <br />