Laserfiche WebLink
<br /> <br />RECLAMATION COSTS <br />The estimated amount to reclaim the site at the point of greatest <br />disturbance is offered below. <br />1. 15 acres of area affected to a minor degree, <br />to be reseeded <br />15 acres x S700/acre ~i'„ $10,500 <br />b, 1.. <br />2. 75.3 acres affected to a major degree, pyre/,~j,p°<<i~FrJ'J <br />to be backfilled, graded and reseeded p' ,~_,r~~:,;~},~,~ <br />~J <br />75.3 acres x $1500/acre :~;~~'~ .,$112,950 <br />3. Construct drainage inlet and outlet '~i "`r <br />structures. _; I $ 3,000 '~Ccf <br />4. Remove bridge 1 $ 1,500 <br />Total reclamation costs ~ / $127,950\ <br />,~~~~~AIF~-' <br />,~N ~ ?.1995 <br />o\v\S o~ o~ M~ne~a~s ~ Geo~o9`1 <br />9 <br />