Laserfiche WebLink
<br /> <br />Activity Quantity Units Unit Cost Cost <br /> <br />A. Stripped Topsoil -ap proximately ] 4 acres of distu rbance <br />1. Replace 6" topsoil 11,294 C.Y. $1.35 $]5,247 <br />2 Seed and mulch 14 Acres $820 $11,480 <br />B. Place topsoil and overburden on 6 acres <br />1. Place 2' overburden 19,360 C.Y. $1.35 $26,136 <br />2. Place 6" topsoil 4840 C.Y. $1.35 $6,534 <br />3. Seed and Mulch 6 Acres $820 $4920 <br />C. Dewatering trench <br />1. Push soil into trench 16,500 C.Y. $1.35 $22,275 <br />2. Replace 6" topsoil 491 C.Y. $135 $663 <br />3. Seed and mulch 1 Acres $820 $820 <br />D. Processing Site <br />1. Replace 6" topsoil 4,034 C.Y. $1.35 $5,446 <br />2. Seed and Mulch 5 Acres $820 $4,100 <br />E. Lake shores <br />1. Backfill shoreline 11,210 C.Y. $1.35 $15,134 <br />2. Replace 6" topsoil 2,420 C.Y. $1.35 $3,267 <br />3. Seed and mulch 3 Acres $820 $2,460 <br />Reclamation cost Total $118,482 <br />Contractor Mobilization 6.0% $7,109 <br />Overhead 12.5% $14,811 <br />Administration 5.0% $5,924 <br />Total $146,326 <br />Disturbed acres 26.8 <br />Financial warranty per acre $5,460 <br />