My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE117598
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE117598
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:13:21 PM
Creation date
11/25/2007 4:02:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002120
IBM Index Class Name
Permit File
Doc Date
12/23/2002
Doc Name
112 Construction Materials Application
From
Hall-Irwin Corporation
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(e) A plan or schedule indicating how and when reclamation will be implemented. Include: <br />(i) An estimate of the periods of time which will be required for the various stages or phases <br />of reclamation; <br />MINING AND RECLAMATION SCHEDULE <br />Section Being Mined Time Estimate.. <br />Pod #1 48 months to mine <br /> 12 months to reclaim <br />Pod #2 84 months to mine <br /> 12 months to reclaim <br />Pod #3 36 months to mine <br /> 12 months to reclaim <br />Pod #4 36 months to mine <br /> 12 months to reclaim <br />Pod #5 84 months to mine <br /> 12 months to reclaim <br />Please note that the first processing area (within Pod #2) will be mined out before Pod <br />#4 is mined. The secondary processing area in Pod #5 will be mined last. <br />Please note that the above schedule is an estimate based on the current market <br />conditions. The timing may vary depending upon the demand for construction material <br />and may impact the total life of the mining operation. <br />(ii) A description of the size and location of each area to be reclaimed during each phase; <br />and <br />Please refer to the Reclamation Plan Map (Exhibit F). <br />(iiiJ Outlining the sequence in which each stage or phase of reclamation will be carried out. <br />Please refer to the Reclamation Plan Map for the reclamation sequence. <br />(f) A description of <br />(i) Final grading -maximum anticipated slope gradient or expected ranges thereof <br />All disturbed areas shall be regraded and smoothed to a finished grade suitable for <br />revegetation: 3:1 slope below high water line; 3:1 slope on reservoir banks, and 4:1 slope <br />on pond banks. <br />Hall-Irwin Corporation Bernhardt Resource Page 18 of 41 <br />MLRB 112 Permit Application <br />
The URL can be used to link to this page
Your browser does not support the video tag.