My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE117497
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE117497
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:13:15 PM
Creation date
11/25/2007 3:54:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001035
IBM Index Class Name
Permit File
Doc Date
9/19/2001
Doc Name
TROUT CREEK PIT M-2001-035 PERMIT ISSUANCE CONSTRUCTION MATERIAL OPERATION
From
DMG
To
ACA PRODUCTS INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />U <br />RmER TO MINING PERMIT <br />Permit Date: September 19, 2001 <br />PemtitNo: M-2001-035 <br /> <br />The following addrtiauial stipulations and conditions form an integral part ofthe foregoing permit: <br />Stipulation No. Descr~tion <br />1. The quarry cut slopes will be ur accordance with the adequacy response recommendations <br />of R. 1. Kish m his report "Rock Cut Slope Stability Assessmerrt, Planned Rock Quarry, <br />Trout Creek Valley, Chaffee County Colorado, Job No. 559". The cut slopes will be <br />benched with 10 feet wide steps spaced about 20 feet apart in elevation and with risers drill- <br />and-blast excavated to .25h:1v (76° slopes). The risers of the cut-slope will be dressed by <br />barring down loose rock. The benches will be sloped to they terminis to limit seepage into <br />the jointed rock. A drainage d¢ch will be excavated immediately up slope of the quarry to <br />divert surface water nmoff around the quarry. <br />2. ACA Products will prepare industry standard blast reports for each blast in the quarry <br />and, copies will be submitted to the Division with each annual report. <br />A maximum charge weigfit of 42 lbs, per delay will not be exceeded without Division <br />approval. Nine millisecond delays will be used. The delay time will net be lessened <br />without Division approval. <br />Each blast in the quarry will be monitored at the dam. A seismograph will be placed <br />on bedrock at the base of the dam. Blast frequency and peak particle velocity will be <br />measured for each blast. Blast frequencies will be limited to no less than 30 Hz. Peak <br />particle velocity will not exceed 2 ips. The dam seismograph monitoring data will be <br />kept by the operator and made available to the Division upon request. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />MICHAEL B. LON <br />Division Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.