My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE117489
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE117489
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:13:15 PM
Creation date
11/25/2007 3:53:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
5/1/2003
Section_Exhibit Name
Tab 17 Probable Hydrologic Consequences
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0.15 feet. The potential two percent increase Sn TDS in the Saqe Creek alluvium will <br />probably not be measurable and will have no adverse effects on the existing water uses. <br />• Premrninq Saqe Creek alluvial water chemistry analyzed at updralnage USGS xells indicates <br />the alluvial water is marginal to uns ul [able for stock and irrigation use. <br />PotenClal Impact of Replaced Spoil on Surface Water Quality. The following impact <br />analyses include an assessment of Seneca II-W spoil water discharge on Dry Creek <br />tributaries, Dry Creek, a Sage Creek tributary, and Sage Creek stream water quality. The <br />previously-referenced equations presented by Ferreira 11984) were utilized to calculate <br />percent increases in TDS and chemical load in tons/day. Table 17-19 lists the spoil and <br />stream reach flow and TDS values used in the impact assessments. The following equations <br />present [he pre mining and postmining chemical load and TDS concentration changes as a <br />result of the spoil aquifer dlscha rging into Dry and Sage Creeks. <br />Dry Creek Drainage Premining: <br />~ Hubberson Gulch L = 0.605 x BB2 x 0.0027 = 1.44 cons/day <br />Watering Trough Gulch L = 0.136 x 772 x 0.0027 = 0.28 tons/day <br />Dry Creek L = 1.5 x 1098 x 0.0027 = 4.24 tons/day <br />• Dry Creek Dra Snage postmining: <br />Hubberson Gulch DSC = 9.16 + 1.44 z 2193 mg/1 (1498 TDS <br />11.2 + 0.6781 x 0.001361 increase) <br />Hubberson Gulch L = 0.947 x 2193 x 0.0027 = 5.61 tons/day (2908 tonnage <br />increase) <br />Waterlog Trough C,ulch DSC = 5.61 + .2B ~ 2024 mg/1 (938 TDS Increase <br />+ Hubberson Gulch I1. B7 + 0.27( x 0.00136 over SGS due to 006 <br />spoil dlscha cgel <br />Watering Trough Gulch L = 1.08 x 2024 x 0.0027 = 5.9 tons/day (398 tonnage <br />+ Hubberson Gulch increase over SG5 <br />due to 006 spoil <br />dlscha rge) <br /> Cumulative Dry Creek Drainage Pos[mi ping: <br /> Dry Creek + 005 Tcib DSC = 5.9 + 1.06 = 2245 mg/1 11148 TDS increase <br /> 2.14 + 0.1731 x 0.00136 over SG5) <br /> D[y Creek + 005 Trib L = 1 .167 x 2245 x 0.0027 7. 07 tons/day 1678 tonnage <br /> increase over <br /> <br />• SG5) <br />99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.