Laserfiche WebLink
eh <br />ESPEY, NUSTON 6 ASSOCIATES, INC. <br />C I <br />TABLE OF CONTENTS (Cont'd) <br /> Section Page <br /> 13.4.1.5 Sediment Pond Collector Ditches 13-15 <br /> 13.4.2 Placement of the Waste }~1 <br />~ <br /> 13.4.2.1 1 <br />1 <br /> 13.5 RECLAMATION PLAN 13-16 <br /> 13.5.1 Pre- and Postmining Land Use 13-17 <br /> 13.5.2, Topagraphq 13-18 <br /> 13.5.3 Topsoil Replacement, Fertilization and Seedbed <br /> Preparation 13-19 <br /> 13.5.3.1 Refuse Preparation Prior to Topsoil Replacement 13-21 <br /> 13.5.3.2 Topsoil Replacement Operations 13-21 <br /> 13.5.3.3 Fertilization 13-23 <br />• 13.5.3.4 Seedbed Preparation 13-25 <br /> 13.5.4 ReveQetation 13-27 <br /> 13.5.4.1 Quantitative Assessment of Reference Area 13-27 <br /> 13.5.4.2 Postmining Seeding Mixtures 13-28 <br /> 13.5.4.3 Preparatory Crops 13-32 <br /> 13.5.4.4 Stabilization of Road Embankments, Hydrologic <br /> Control Structures, and Stockpiles 13-33 <br /> 13.5.4.5 Seeding Methods and Planting Dates 13-39 <br /> 13.5,4.6 Mulching 13-43 <br /> 13.5.5 JudQinq Reclamation Success 13-44 <br /> 13.5.6 Erosion Control 13-45 <br /> 13.5.6.1 Existing Soil Erosion Rates 13-46 <br /> 13.5.6.2 Anticipated Soil Erosion Rates 13-46 <br /> 13.5.7 Maintenance 13-47 <br /> 13.5.7.1 Fencing 13-48 <br /> 13.5.7.2 Signs 13-48 <br /> 13.5.7.3 Irrigation 13-48 <br />• <br />iii <br />