Laserfiche WebLink
(3) Reclamation Plan Map <br />Attached map <br />(a) All slopes will be 3 to 1 slope or less see map. <br />(b) The reclamation plan calls for reseeding of all disturbed areas within permit area. <br />Since the site is small we aze going to let nature reseed trees and shrubs in area with wind <br />and animals spreading the seeds. <br />© No ponds or other water sources will be wnstructed. <br />(d) Mine is an underground mine with no overburden to be removed except at portal <br />location. Waste rock fill will be blended to top of Mine portal to match natural contours. <br />Reclamation will be only one phase. <br />(e) Surface soil will be reapplied approximately 4 inches thick. Reclamation will be only <br />one phase. <br />Exhibit G Source of Legal Right to Enter (Rule 6.3.'~ <br />See attached letter from BLM <br />Exhibit L Permanent Man Made Structure (6.3.12) <br />County road Y 1 is only man made structure in or with in 200 feet of site. The mine is an <br />underground mine with no impact on the road, other than traffic. The road has no <br />improvements, no culverts, and no gravel. It is basically a dirt path. <br />Sind ~`~'t~i <br />Alan Chiles <br />President <br />