Laserfiche WebLink
•. Maps <br />1. Three additional copies of Maps 1, 2, and 3 referenced in the <br />February 25, 1982 adequacy response from Eldon Strid should be <br />submitted. <br />K. Roads -Rule 4.03 <br />1. What roads are used to gain access to springs and subsidence <br />monitoring sites? <br />L. Post-Mining Land Use - Rule 2.05.5 <br />1. Does the Gunnison County Planning Commission allow residentlal land <br />use within the 100 year flood plain? <br />2. Delineate which structures are to be left following reclamation at <br />the Bear no. 3 site. <br />Part II. Advisory Comments <br />The following concerns were identified during the mid-term review process but <br />o not constitute a problem at this time. Bear Coal Co. is encouraged to <br />~spond to these concerns in a tlmely fashion. Clarification of these issues <br />should facilitate a smoother review of upcoming 5-year permit applications and <br />allow for the collection and submission of better monitoring .data and reports. <br />1. The 1984 Alluvial Well Report exhibits several problems. Samples <br />and-results must clearly show the sample date. Samples are to be <br />preserved by refrigeration and shipped to the lab as soon as <br />possible. Groundwater samples should be properly filtered <br />immediately after the sample is taken. High concentrations of <br />aluminum in some of the sample analyses may be a result of <br />inadequate filtering. <br />2. Bear Coal Company should designate a due date in late winter/early <br />spring for submittal of monitoring data collected in accordance <br />with Stipulations No. 4, 5, and 6 every year. <br />n <br />U <br />