• 3. Bear Coal Co. should submit a technical revision deleting from <br />their permit the portions of the Bear no. 1 and no. 2 reclaimed <br />areas which have been taken over by West Elk Coal Co. Partial bond <br />release, in accordance with Rule 3.03 may be pursued for Bear No. 1 <br />and 2. <br />4. Bear Coal Ca. should re-evaluate the condition of the landslide and <br />the retaining structure adjacent to the fan to determine the <br />retaining structure's ability to continue to retain the slope. If <br />re-engineering, repair, or replacement is necessary, plans to do so <br />should be submitted to the Division. <br />D. Mine Facilities <br />1. Bridge and conveyor footings of concrete remain in the North Fork <br />near Bear no. 1. Complete removal of these structures is addressed <br />in the reclamation plan. What is the timetable for removal of <br />these structuresY <br />E. Hydrologic Balance <br />1. Please submit a reclamation plan far the flood control berm. <br />2. A detailed map showing spring locations in the Bear no. 3 area <br />should be submitted. The current map(Drawing 2.04.7(2)(a)) is not <br />sufficient]y detailed. This information may be included on the <br />Geology/Hydrology map. - <br />3. A map showing the placement bf alluvial monitoring wells at Bear <br />no. `1, no. 2 and no. 3 and piezometric surface contours determined <br />from well data should be submitted. <br />4. Bear Coal Co. should address water usage and inflows within the <br />mine during the past 12 months and any impacts in accordance with <br />stipulation no. 4. <br />5.. Bear Coal Co. should submit an annual hydrologic report as per <br />stipulation no. 6. <br />6. Quarterly pond inspection reports should continue to be generated <br />and submitted to the Division for pond no. 3. . <br />7. Has any flow data for Lone Pine Gulch been collected. <br />8. Bear Coal Co. should demonstrate that the gated pipe installed as <br />principal spillway in the sediment pond embankment does or can meet <br />the requirements of the open orifice design submitted in response <br />• to Stipulation No. 1. <br />