My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE117359
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE117359
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:13:07 PM
Creation date
11/25/2007 3:37:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 15 MIDTERM PERMIT REVIEW, 1985
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Mr. Randy Spencer <br />Ms. Susan Mowry <br />August 1, 1985 <br />• F.2 <br />Page Six <br />Bear Coal Company agreed to set up a monitoring program to <br />monitor revegetation success at Bear No. 1 and Bear No. 2. <br />This monitoring program will be kept on file for inspection <br />by the Division. Again, the area in question will be the <br />area under Bear Coal Company's responsibility. Bear Coal <br />Company stated that top soil from the river channel <br />realignment was not analyzed, but was used for topsoil in <br />the revegetation zones at Bear No. 1 and No. 2. The <br />Division stated that revegetation success in those areas <br />could determine soil suitability. Therefore, it was <br />suggested that this be tied into the vegetation monitoring <br />program. If the soil was determined not to be suitable, <br />then other methods such as fertilization would need to be <br />implemented. <br />• F.4 <br />• Bear Coal Company <br />determined in the <br />table would be can <br />removal of debris, <br />No. 1 and Bear No. <br />agreed that once responsibilities were <br />Bear No. 1 and No. 2 area, that a time <br />ipleted and submitted to the Division for <br />soil replacement, and seeding at Bear <br />2. <br />• F.5 <br />Bear Coal Company agreed to substantiate the cost submitted <br />for erosion netting application and this would be included <br />in the new reclamation bond estimate. <br />• G.1 <br />Bear Coal Company agreed to submit 1985 monitoring results <br />of the Bear No. 2 portal backfill. <br />• G.2 <br />Bear Coal Company stated that the proctor testing at the <br />Bear No. 1 portal backfill had not been completed. Bear <br />Coal Company agreed to have the portal backfill tested, <br />certified, and submitted to the Division. <br />• • G.3 <br />Bear Coal Company stated that the monitoring of the Bear <br />No. 3 portal area and access road for 1985 has been <br />completed by Ute Engineering and will be submitted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.