Laserfiche WebLink
<br />TABLE V-4 <br />TOPSOIL VOLUME ESTIMATES <br />• <br /> <br /> <br />DESIGNATION DISTURBED <br />AREA <br />(ACRES) VOLUME <br />AVAILABLE <br />(ACRE- <br />FEET) AVG. AVAIL. <br />THICKNESS <br />(FEET) VOL. TO BE <br />STRIPPED <br />(ACRE-FEET) AVG. <br />RECLNMED <br />THICKNESS <br />(FEET) VOL. REGD. <br />FOR <br />RECLAMATIO <br />N <br />(ACRE-FEET) STOCKPILE <br />SHOWN ON <br />MAP <br />"D"POrtal 39.08 58.45 1.49 54.18 1.31 51.72 28828 <br />Ventilation Entry ll)8 <br />Access Roatl' 2.86 0 0 0 .33 0.94 71 <br />WaterSbrageBACCess <br />Road 8.17 d.18 .51 2.70 .33 2.70 57856 <br />Alluvial We118 1.80 1.44 0.80 0.90 0.5 0.90 90 <br />Plan! Access 8 Refuse <br />Haul Rtl.lb be reclaimed) 17.84 125 .71 10.41 .80 10.54 70 8 71 <br />Refuse Haul Rtl. 27.54 27.5 1.00 27.6 1.00 27.54 71, 72, 73, 76 <br />8 75 <br />Waste Disposal Areas <br />Sub Area l' id.OT 25.68 1.83 21.21 i.BS 26.03 77 <br />Sub Area 2-3 3217 72.55 2.26 27.0 0.90 27.0 77 <br />Sub Area6 28.71 52.97 1.85 40.00 1.50 60.00 P <br />Sub Area SA 86.00 88.6 1.3 86.6 f.3 68.6 77A <br />Overlantl COnveyor8 <br />Maintenance Road 96.23 29.41 0.81 13.59 0.38 13.59 106113 <br />Slot Sto2ge 8.00 13.00 1.63 3.16 0.40 3.18 105 <br />Halantlras Trash DUmp' 1240 2.21 2.01 2.21 2.01 2.21 136 <br />B Seam Vent ShaflB <br />Access 1.37 0.77 0.57 0.77 0.57 0]] 151 <br />Note: (1) Topsoil supplied from antl stored at Haul Road topsoil stockpile #3 <br />' All or substantial portion of these areas already topsoiled during reGamation. <br />TABLE V-0A <br />EXISTING TOPSOILISUBSOILSTOCKPlLE ESTIMATE <br />PERTAINING TO THE REFUSE AREAS <br />COMPILED FROM AS-BUILT STOCKPILE VOLUME SURVEY <br />REFUSE AREA AVAILABLE <br />TOPSOIL COVER DEPTH AVAILABLE <br />SUBSOIL COVER DEPTH <br />RP 2/3 43,500 cy 0.9 ft 115,000 cy 2.4 ft <br />RP-4 64,500 cy 1.5 ft. 98,000 cy 2.4 ft <br />RP-5A 143,000 cy 1.3 ft 267,500 cy 3.0 ft <br />(Only 30 inches of cover is required over the refuse of which 12 inches are to be topsoil. Excess materials may be <br />• used on subsequent refuse areas, on other areas that are lacking in topsoil, or reclaimed in place as appropriate.) <br />Mid-Term Review 2002 (8!2002) V-26 <br />