Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br /> <br />Topsoi I ing <br />Subgrade will be established, as far as possible, with rejectgravel <br />and a similar material. After rough grade of the shore line area <br />is established, it will be ripped and scarified, leaving the surface <br />rough before topsoil is placed. Topsoil will be placed in 6 to 10 <br />~~- <br />inch thick layers over all areas to be revegetated. Prior to seeding, <br />commercial fertilizer will be applied and tilled into the soil at the <br />rate of 400 lbs. per acre. <br />Revegetation <br />The shoreline areas generally are gentle slopes between property line <br />and the lake's water line. <br />The following seed mixture in pounds of pure live seed per acre will <br />be used for all areas: <br />Species <br />Western Wheatgrass <br />Indian Ricegrass <br />Blue Grama <br />Rate in Ibs/acre pure live seed <br />3 Ibs/acre <br />2 Ibs/acre <br />0.5 Ibs/acre <br />Seeding will be done as each phase is prepared for revegetation and <br />will be a continuous process through all three phases. The seeding <br />will be done with a drill equipped with depth bands and packing <br />Pn..o d7 ..F /./. <br />