Laserfiche WebLink
3- 111 ff <br />GRAPHIC SCALE <br />zoo 0 100 200 400 <br />( IN FEET ) <br />1 Inch = 200 ft. MAXIMUM LIMIT OF MINING PERMIT BOUNDARY <br />(AFFECTED AREA) <br />NTOUR INTERVAL - 2' X- <br />SUBJECT SITE LOCATED IN SECTION 19, T9S, R61W <br />OF THE 6TH P.M. - - - _ —• •� -,— - - '- -- / // <br />r�irs�irr�% rrrr— rr��rrr>•�rr��rrr�rr�rrr�rrr�r rrrt•rr�rrrr>•r�r>_rr rrT r�rr��rrrr>• ��� �rr�ii�� `r�rrr>— rrr!_r�rr>•rr�rr�rrr�rr <br />C Gh <br />- \ EARTHEN BERM INSTALLED AS NEEDED TO <br />PREVENT RUNOFF TO STOCK WATER POND <br />I <br />i <br />/ <br />/ <br />/ // / <br />e -- _ —Mz__ <br />l sTM S�f'A 4 R <br />rrTrr��rr�ri�rr�rr�rr�lr <br />ABANDON EXISTING ACCESS <br />TO NORTH ENTRANCE v / <br />r=_ -- �: v <br />—1 <br />• I : MAXIMUM LIMIT I / / �� NIN <br />\ AFFECTED AREA <br />OF MNING <br />PRODUCT (CLAY) STOCKPILE FOOTPRINT 1 <br />\ ✓ \��`� 1 r 1 I (SEE NOTE 7) (APPROX. 60,000 CY. <br />SURGE CAPACITY TO STAGE FOR HAULING) 11 I <br />\ \ \ \ p \� ___ O OVERBURDEN A WASTE 11 <br />TRENCH TO INTERCEPT / 1 I EXISTING AND FUTURE ACCESS ROAD <br />\ � / � �= -= _ � - I AND DIVERT RUNOFF-' 1 ,STOCKPILE 11 <br />� _ - � I 11 WILL BE USED DURING AND AFTER MINING <br />/ <br />1 <br />\ <br />- J \ \ - - I ( I I (APPROX. 60,000 CY. CAPACITY) 11 ( / CCESS .1p <br />FOR AGRICULTURAL (GRAZING) A . AT ITS ___ � \ ✓ OPERATOR \ \\``\\\ 1�1 / /( ROAD OAD-TO ,NEEDED WIDTH, DISCRETION, GRADE <br />1 11I THE ROAD TO A 15 WIDTH, AND PLACE <br />\ I \ \ \ I \ \\\ MINING WILL START .I <br />IN APPROXIMATELY <br />THIS LOCATION AND <br />ADVANCE! AS SHOWN <br />BY THE LARGE' <br />ARROWS] DEPENDING I <br />ON RESOURCE <br />I I Ill I II I <br />l <br />v A _ AVAILABILITY AND / - ' 4I I ` <br />QUALITY l ` <br />(/ I i WATER QUALITY BASIN <br />l <br />(SEE NOTE 6) <br />•� v �` �V ��� ,- �' ' tit / l �V A / tt i <br />\ <br />CONTROLLED STO1t ATER RELEASE /• I \ TOPSOIL SS�OCKPILE <br />�W �' PUMP WATER TO SWA�E TO EVACUATE 1tt <br />\ , - ti - -- - - - - -(LESS THAN 72 HOUR DETENIIOPI DESIGN) PIT AREAS IN EARLY PH '$ES OF MINING <br />( I \ \ (APPROX. 2,500 CY. CAPACITY) 1t 1 <br />At <br />_&1 40 - I, ' , \%,tt 1 I <br />tt✓ <br />I It <br />PRASE OUT EXIST] l ACCESS, <br />TO fACIEITATE MIN <br />till <br />SEE NOTE <br />( <br />\ \ \ \ 1 \ CATTLE PENS <br />\ 1 I \ I \ iii � \ \ ` \ \ ♦�. ` \`_��- / All <br />STORMWATER INTERCEPT TRENCH <br />\ I <br />2, =,':1 <br />r— rrr�rrrr>•r�� SECTION LINE <br />PROPERTY LINE /PERMIT BOUNDARY <br />— — — — — — AFFECTED AREA <br />PAVED ROAD <br />---------------- <br />---------------- -----_ UNPAVED ROAD <br />---------------- PROPOSED ACCESS <br />- •.•- ••---- • -•••- - DITCH / WATERWAY <br />- -. FENCE <br />- n „u o „u oeU— - o „U OVERHEAD ELECTRIC LINE <br />EXISTING INDEX CONTOUR <br />EXISTING INTERMEDIATE CONTOUR <br />DRAINAGE DIRECTION <br />NO SCALE <br />60' WIDE BENCH - <br />1 <br />1�_/_ 20' MAX. HIGHWALL <br />60' APPROX. DEPTH <br />I1 1I <br />II <br />ll <br />11 l <br />ttl <br />I <br />\ N; <br />1 <br />\ 6�/ <br />i <br />9 <br />� v POINT OF ACCESS, RELOCATED IN <br />ACCORDANCE WITH ELBERT COUNTY <br />\ ` ROAD R BRIDGE <br />1 l � <br />I I <br />/I I \\ \\ <br />A\ <br />\ ( 1 1 \ \ <br />\ 1 <br />I I I <br />I <br />/ I / <br />N <br />\ <br />1 �\ <br />I <br />I i <br />1 \ <br />l � \ <br />� 1 <br />/J 1 <br />\ r <br />NOTES: <br />1. AFFECTED AREA, INCLUDING MINING, LAYOUT, AND <br />ACCESS ACTIVITIES, WILL BE OVER 200 FEET FROM <br />ANY PERMANENT MAN MADE STRUCTURES NOT <br />CONTROLLED BY THE APPLICANT, WITH THE EXCEPTION <br />OF TWO STRUCTURES NEAR THE ACCESS FROM <br />COUNTY ROAD 89. BOTH THE COUNTY ROAD AND <br />OVERHEAD POWER LINES WILL BE SUBJECT TO THE <br />PROVISIONS OF RULE 6.4.19. <br />2. THE AFFECTED AREA INCLUDES OPERATIONS TO THE <br />EAST OF THE MINING AREA. FOR THE PURPOSES OF <br />THIS PLAN, THE ACCESS ROAD IS INCLUDED IN THE <br />CALCULATION OF AFFECTED AREA; HOWEVER, THE <br />ACCESS ROAD IS USED FOR MULTIPLE PURPOSES, <br />INCLUDING THE EXISTING LIVESTOCK OPERATION TO BE <br />CONTINUED DURING MINING, AND IS ANTICIPATED TO <br />REMAIN FOLLOWING THE RELEASE OF THE SITE FROM <br />RECLAMATION. <br />3. MINING SLOPES WILL CONFORM TO THE DETAIL ON <br />THIS SHEET, WITH NO EXCAVATION GREATER THAN 20 <br />FEET IN DEPTH WITHOUT A BENCH AREA. SLOPES <br />WILL GENERALLY BE MINED FROM EAST TO WEST AND <br />WILL RESULT IN THE GRADING CONFIGURATION SHOWN <br />ON EXHIBIT F. THE OPERATOR WILL HAVE THE OPTION <br />TO IMPLEMENT SLOPS LESS THAN 1:1 AT THE TIME <br />OF MINING; FINAL SLOPES MAY BE ACHIEVED DURING <br />MINING. <br />4. THE OPERATOR WILL ENSURE PROPER TREATMENT OF <br />STORMWATER, INCLUDING RETURN TO THE REGIONAL <br />DRAINAGE SYSTEM WITHIN 72 HOURS OF RUNOFF ON <br />THE SITE. THE SCHEMATIC STORMWATER PLAN <br />ILLUSTRATED ON THIS DRAWING WILL BE THE BASIS <br />OF COMPLIANCE MEASURES RELATED TO WATER <br />QUALITY AND FLOOD CONTROL REGULATIONS. <br />5. EXISTING ACCESS ROADS WILL BE MAINTAINED DURING <br />EARLY PHASES OF MINING. MINING ROADS MAY ALSO <br />PERMIT ACCESS TO WESTERN AREAS OF THE SITE <br />DURING LATER MINING PHASES. ANY NON- MINING USE <br />REQUIRING SEPARATE ACCESS MAY UTILIZE BUFFER <br />AREAS TO DEVELOP NEW ACCESS ON EITHER THE <br />NORTH OR SOUTH EDGE OF THE PROPERTY. <br />6. A WATER QUALITY BASIN WILL BE DEVELOPED TO <br />DETAIN RUNOFF FROM DISTURBED AREAS. DESIGN <br />WILL BE CONSISTENT WITH ENGINEERING PARAMETERS <br />FOR A 100 -YEAR STORM EVENT AND WILL ADHERE <br />TO ALL APPLICABLE PERMITTING REQUIREMENTS. NO <br />RETENTION OR OTHER IMPACT ON WATER RIGHTS WILL <br />BE PERMITTED. <br />7. THE PRODUCT STOCKPILE FOOTPRINT WILL NOT <br />REMAIN UNDISTURBED FOR LONGER THAN 12 MONTHS. <br />THE STOCKPILE WILL BE IN CONTINUOUS USE AS A <br />SOURCE OF CLAY FOR PROCESSING OFF -SITE, WITH <br />SOME AMOUNT OF TEMPORARY CLAY STORAGE <br />ANTICIPATED TO OCCUR ON THE PROPERTY AT ALL <br />TIMES. <br />Permit Confidential? N DOE I <br />Class CI sGJ /T Type Segby� <br />MV# Inspection Date <br />Doc Date (if na date stamp) - <br />DocNameR /A/ /f, <br />From DRMS /Other ;w r-e�e <br />To DRMS /Other <br />Recipients <br />i� <br />REVISED EXHIBIT C -3: MINING PLAN MAP <br />PREPARED BY: APPLICANT: PROJECT: <br />EN BANKS AND GESSO, LLC. THE DENVER BRICK COMPANY KIOWA CLAY MINE <br />■■ 720 KIPLING ST., SUITE 117 401 PRAIRIE HAWK DRIVE DBMS REGULAR 112 PERMIT <br />LAKEWOOD, COLORADO 80215 CASTLE ROCK, CO 80109 ELBERT COUNTY <br />(303) 274 -4277 (303) 688 -6951 COLORADO <br />JOB NO DATE SCALE DRAWN BY DESIGNED BY APPROVAL REV SHEET <br />06032 4/16/07 1' =200' DRF PB I 1 <br />\ I <br />I 1 <br />1 <br />1 t <br />t I <br />I <br />I I <br />I I <br />I <br />I I <br />I j <br />j \ <br />\ 1 <br />1 <br />N <br />\ <br />1 �\ <br />I <br />I i <br />1 \ <br />l � \ <br />� 1 <br />/J 1 <br />\ r <br />NOTES: <br />1. AFFECTED AREA, INCLUDING MINING, LAYOUT, AND <br />ACCESS ACTIVITIES, WILL BE OVER 200 FEET FROM <br />ANY PERMANENT MAN MADE STRUCTURES NOT <br />CONTROLLED BY THE APPLICANT, WITH THE EXCEPTION <br />OF TWO STRUCTURES NEAR THE ACCESS FROM <br />COUNTY ROAD 89. BOTH THE COUNTY ROAD AND <br />OVERHEAD POWER LINES WILL BE SUBJECT TO THE <br />PROVISIONS OF RULE 6.4.19. <br />2. THE AFFECTED AREA INCLUDES OPERATIONS TO THE <br />EAST OF THE MINING AREA. FOR THE PURPOSES OF <br />THIS PLAN, THE ACCESS ROAD IS INCLUDED IN THE <br />CALCULATION OF AFFECTED AREA; HOWEVER, THE <br />ACCESS ROAD IS USED FOR MULTIPLE PURPOSES, <br />INCLUDING THE EXISTING LIVESTOCK OPERATION TO BE <br />CONTINUED DURING MINING, AND IS ANTICIPATED TO <br />REMAIN FOLLOWING THE RELEASE OF THE SITE FROM <br />RECLAMATION. <br />3. MINING SLOPES WILL CONFORM TO THE DETAIL ON <br />THIS SHEET, WITH NO EXCAVATION GREATER THAN 20 <br />FEET IN DEPTH WITHOUT A BENCH AREA. SLOPES <br />WILL GENERALLY BE MINED FROM EAST TO WEST AND <br />WILL RESULT IN THE GRADING CONFIGURATION SHOWN <br />ON EXHIBIT F. THE OPERATOR WILL HAVE THE OPTION <br />TO IMPLEMENT SLOPS LESS THAN 1:1 AT THE TIME <br />OF MINING; FINAL SLOPES MAY BE ACHIEVED DURING <br />MINING. <br />4. THE OPERATOR WILL ENSURE PROPER TREATMENT OF <br />STORMWATER, INCLUDING RETURN TO THE REGIONAL <br />DRAINAGE SYSTEM WITHIN 72 HOURS OF RUNOFF ON <br />THE SITE. THE SCHEMATIC STORMWATER PLAN <br />ILLUSTRATED ON THIS DRAWING WILL BE THE BASIS <br />OF COMPLIANCE MEASURES RELATED TO WATER <br />QUALITY AND FLOOD CONTROL REGULATIONS. <br />5. EXISTING ACCESS ROADS WILL BE MAINTAINED DURING <br />EARLY PHASES OF MINING. MINING ROADS MAY ALSO <br />PERMIT ACCESS TO WESTERN AREAS OF THE SITE <br />DURING LATER MINING PHASES. ANY NON- MINING USE <br />REQUIRING SEPARATE ACCESS MAY UTILIZE BUFFER <br />AREAS TO DEVELOP NEW ACCESS ON EITHER THE <br />NORTH OR SOUTH EDGE OF THE PROPERTY. <br />6. A WATER QUALITY BASIN WILL BE DEVELOPED TO <br />DETAIN RUNOFF FROM DISTURBED AREAS. DESIGN <br />WILL BE CONSISTENT WITH ENGINEERING PARAMETERS <br />FOR A 100 -YEAR STORM EVENT AND WILL ADHERE <br />TO ALL APPLICABLE PERMITTING REQUIREMENTS. NO <br />RETENTION OR OTHER IMPACT ON WATER RIGHTS WILL <br />BE PERMITTED. <br />7. THE PRODUCT STOCKPILE FOOTPRINT WILL NOT <br />REMAIN UNDISTURBED FOR LONGER THAN 12 MONTHS. <br />THE STOCKPILE WILL BE IN CONTINUOUS USE AS A <br />SOURCE OF CLAY FOR PROCESSING OFF -SITE, WITH <br />SOME AMOUNT OF TEMPORARY CLAY STORAGE <br />ANTICIPATED TO OCCUR ON THE PROPERTY AT ALL <br />TIMES. <br />Permit Confidential? N DOE I <br />Class CI sGJ /T Type Segby� <br />MV# Inspection Date <br />Doc Date (if na date stamp) - <br />DocNameR /A/ /f, <br />From DRMS /Other ;w r-e�e <br />To DRMS /Other <br />Recipients <br />i� <br />REVISED EXHIBIT C -3: MINING PLAN MAP <br />PREPARED BY: APPLICANT: PROJECT: <br />EN BANKS AND GESSO, LLC. THE DENVER BRICK COMPANY KIOWA CLAY MINE <br />■■ 720 KIPLING ST., SUITE 117 401 PRAIRIE HAWK DRIVE DBMS REGULAR 112 PERMIT <br />LAKEWOOD, COLORADO 80215 CASTLE ROCK, CO 80109 ELBERT COUNTY <br />(303) 274 -4277 (303) 688 -6951 COLORADO <br />JOB NO DATE SCALE DRAWN BY DESIGNED BY APPROVAL REV SHEET <br />06032 4/16/07 1' =200' DRF PB I 1 <br />