Laserfiche WebLink
Bonding Calculations <br />Northfield Exploration Ngtice of Intent <br />Drilline Project Data: <br />Number of drill holes 3 <br />Hole diameter 6 inch <br />Total drilled footage (proposed + 10%) 1990 feet <br />Drill holes > 200 feet deep All <br />Gallons of fluid per linear foot 1.5 gal. <br />Abandonment fluid cost per lineal foot $0.18 <br />Cement cost per lineal foot $0.90 <br />Northfield Partners LLC <br />Feb. 24, 2005 <br />Reerading_Drill Sites Cost <br />Regrade 3 pads, 0.1 afire each, level to slight grade, use dozer or backhoe. <br />2 hour/ site x $154/hour x 3 sites = <br />$924 <br />Subtotal $924 <br />Reseed Drill Pads and Trails <br />Total azea of disturbance of 0.72 acres, <br />includes 1500 feet x 12 feet of temporary drill trails and 3 drill pads of 0.1 acre <br />each. $360 <br />0.72 acres x $500/acre = <br />Subtotal $360 <br />Page 1 <br />