<br />Mine~Disturtiance,Area ~ ''~ S ~ {, ~~~ .
<br />~~~SO R~~GQ, ~
<br />Disturbance~Area IAc)'. AB ~E 2e05tE5~'f-`1s .•,' _
<br />@ Y',+A~AD ~. E t'AE MEN7 5 ~
<br />„Soil'RecovEi ~Voluine;IC~') :,a' .,,,E,~..,.
<br />°`
<br />`~Re'lacement De'th,IFt)`J .~- _~, e„:w ,,,~~,... ~~:
<br />
<br />,.Re laeement'Volume;IC 1~
<br />EIk Creek Coal Handling, Support, and
<br />Ancillar Facilities' 39.0 5,600 0.3° 17,600
<br />
<br />Sanborn Creek Mine Surface Facilities 4.1 2,600 0.5 3,300
<br />
<br />West Valle Fill and Haul Road 12.9 10,400 0.7° 15,800
<br />
<br />Elk Creek Mine Surface Facilities 24.2 46,600 0.7 27,300
<br />
<br />Satellite Facilities
<br />U er Hubbard Creek Facilities 3.3 850 0.2 850
<br />Lower Hubbard Creek Facilities' 2.6 N/A N/A N/A
<br />Hubbard Creek Powerline Road 0.7 N/A N/A N/A
<br />Bear Creek Facilities Area' 3.0 N/A N/A N/A
<br />Water Treatment Plant Area 1.5 N/A 0.5' 1,200
<br />Sewa a Effluent Absor tion Field 0.3 N/A N/A N/A
<br />Substation No. 3 and C-Gulch
<br />Ventilation Installation 1.6 5,000 1.9 5,000
<br />Coal Gulch Ex loration Sites 0.4 N/A N/A N/A
<br />Powerline Roads' 17.0 N/A N/A N/A
<br />Degassification Borehole Sites and
<br />Roads° 5.1 N/A N/A N/A
<br />Subtotal -Satellite Facilities 31.5 5,850 N/A 7,050
<br />
<br />Total 115.7 71,050 71,050
<br />
<br />Notes: ° All soil would come from North Elk Creek Soil Stockpile except for satellite facilities, which each have their own soil stockpile lonly satellite
<br />facility with a remaining soil stockpile is Substation No. 3 and C-Gulch Ventilation Installation)
<br />' No soil was recovered for the majority of this area Ipre-law disturbancel. Soil volumes shown were recovered during recent mine facilities
<br />expansion. ,
<br />Z Facilities have been reclaimed, with available stockpiled topsoil or suitable surficial materials used in reclamation.
<br />~ Powerline roads have been disturbed by Delta-Montrose Electric Association and are not mine disturbance.
<br />° As short-term disturbances, all soil recovered from borehole sites and roads has been windrowed adjacent to disturbance and directly replaced on
<br />completion of disturbance (volumes not measuredl.
<br />° Since no soil was recovered from original disturbance areas, use of suitable surficial materials as revegetation medium has been approved and
<br />will be supplemented with available excess soil from other areas, with priority on areas where surficial materials are marginal to unsuitable.
<br />° Soil replacement depth for West Valley Fill will be 1 foot with 0.7 foot replacement depth for the remainder of disturbance area.
<br />Although soil was not originally salvaged from this area, available excess soil from other areas will be used to enhance revegetation success.