Laserfiche WebLink
SEDCAD 4.0 <br />Copyright 1999 Pemele J. Schwab <br />Cnril Software Design <br />• SW entrance road to Pit 2-3&4. Road and pit runoff <br />combined, 4.16 cfs, single ditch. <br />Culvert Inputs: <br />1 <br />Max. Entrance <br />Length (R) Slope (%) Manning's n Headwater Tailwater (R) Loss Ccef. <br />(R) (Ke) <br />40.00 2.00 0.0150 2.00 0.00 0.9( <br />Culvert Results: <br />Minimum pipe diameter required: 12 inches <br />• <br /> <br />SEDCAD UGliry Run <br />Printed 09-28-1998 <br />