Laserfiche WebLink
Reclamation Cost Estimate Exhibit E (revised) <br />The following reclamation cost estimate is based on the proposal that there will be no more <br />than 8.0 acres f disturbed at any one time. The mine working face will be graded to 2h:ly when <br />mining ceases. Cut/fill activities will be necessary to bring working face to the desired slope. <br />The working face will also be pocketed with a track hoe during the cut/fill process. The table <br />below outlines the stages of the reclamation process. A dozer will be used to shape and grade <br />the staging azea. The seed mix and the labor to broadcast the seed aze also included in this <br />estimate. <br />Stage Total <br />Terrace Reclamation 3.0 AC. <br />Revegetation 3.0 AC. <br />Estimated Unit Costs for Reclamation Items: <br />Unit Cost <br />1. Revegetation area includes grass seed and labor $900.00/AC. <br />2. High wall reclamation (cut and fill) $135.00/hour <br />Reclamation Cost <br />1. Revegetation of slopes, 3.0 acres @ $900>1.0/AC. $2,700.00 <br />2. High wall reclamation @135/hour * 80 hours $10,800.00 <br />Net Total $13,500.00 <br />3. Indirect costs <br />Mobilization $1431.00 <br />Insurance, Bond, & Profit $756.00 <br />4. Administration Costs 954.00 <br />Total Estimate $16,641.00 <br />Recommended bond be set at $25,000.00 <br />NORTH CLEAR CREEK CONSTR[iCT[ON MATExrnr c MINE COADILLERAN COMPLIANCE SERVICES, INC <br />E05574 PAGE ~3 GIihND1LN CTION,COLORADO <br />