Laserfiche WebLink
]Il. In the event of a spill incident, the contaminated areas will be cleaned up with on-site equipment and personnel. <br />• All PCB transformers have been retrofilled and are free of PCB's. <br />If an incident occurs within the waste accumulation area, the Emergency Response Plan (attached) will be <br />implemented as needed. <br />IV. This plan shall be updated and/or revised whenever permanent storage tanks are added or moved, or <br />modifications are made to the waste accumulation facility. <br />• <br />4-18f i=Eeu,s~o~~: .pit' /~f <br />~f0~d~~:~[~p2 _ <br />