My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE117139
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE117139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:12:53 PM
Creation date
11/25/2007 3:19:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996076
IBM Index Class Name
Permit File
Doc Date
1/27/1997
Doc Name
FINANCIAL WARRANTY 2ND ADEQUACY LETTER WESTERN SLOPE FLAGSTONE QUARRY 2 PN M-96-076
From
DMG
To
WESTERN LOPE FLAGSTONE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.l Task Description I Cost (f) <br />------- I -------------------------------------------- I---------- <br />NA No portals or shafts created by operation. <br />I I <br />I I <br />I I <br />Subtotal (K): <br />L. DRILL HOLE/MONITORING WELL SEALING <br />Task No. Task Description Lost (S) <br />-------- I ----------------------------------------------- I ---------- <br />NA I No drill holes or monitoring welts created. I <br />I I <br />I I <br />I I <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No. <br />-------- l <br />I --------- Task Description I <br />----------------------------------- I - Cost (f) <br />-------- <br /> <br />5 I <br />I Demolition <br />assume 5'H *5'W *10' I <br />L mass @ f0.22/tf <br />f55 <br />3 Seeding Per attached Task 3 worksheets. 5930 <br />NA Fencing Fencing not current requirement. <br />4 Mob/Demob Per attached Task 4 worksheets. 5596 <br />Subtotal (M): 51.581 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 52.605 <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD b PROFIT <br />Item No. <br />-------- I Item Description <br />-----------------'-------------- <br />------- I <br />-------- Cost (f) <br />------------ <br />1. Public Liability Insurance.... 1.550% I <br />of dir. I S40 <br />2. Contractor's Performance Bond 0.975% of dir. S25 <br />3. I Contractor's Profit........... 10.00% of dir. I 5260 <br />4. Job Superintendent..Eq. operator serves as super.) <br />Subtotal (A): 5326 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 d P): 32,931 <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item No.l Item Description I Cost (S) <br />'----- I `---------------------`---------------- I ~- - <br />I I <br />1. I Minerals Program Admin. Fee at 5.00% of cntr. f147 <br />NET INDIRECT COST PERCENTAGE:~18.15X Subtotal (B): 5147 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 5473 <br />TOTAL PERFORMANCE 80ND AMOUNT (direct plus indirect costs): 53.078 <br />
The URL can be used to link to this page
Your browser does not support the video tag.