Laserfiche WebLink
i. <br />E~dbit H <br /> <br />Mining x111 begin at the north side of the e~d.sting <br />pit and proceed south, There will be a high xall appro~ / ,j <br />imatly ten to fifteen feet high and length of high <br />xall x111 be appro~dmatly seventy five feet, <br />Mining x111 be done xith loaders.doeera and backhoea, <br />Noblasting x111 be required or done. <br />There is no water to be disturbed and ao crushed w~ <br />rTill b9 done, <br />