22TG3E33XC and 22TG3E34XC Project Plan <br />Minor Revision 324 <br />Page 7 of 12 <br />PROPOSED ACCESS ROUTES <br />The access route for these wells will along the road leading to the 21-O1, 21-02, 21-03 <br />and 21-04 MDW's. This road alignment is depicted on the attached map <br />PRE-DRILLING ACTIVI"PIES <br />Construction and drilling activities will be supervised by a project representative of <br />Mountain Coal Company, L.L.C. Any significant proposed changes in the project after <br />permit approval would be reviewed with the appropriate regulatory agencies before <br />changes take effect <br />Staging areas to be used by the drilling contractor will be used in a manner to minimise <br />damage to the vegetation. Any surface disturbance to these sites will be re-graded and <br />seeded to promote rehabilitation. <br />Access mutes will be maintained to accommodate fiill sized 4X4 pickup trucks, ATVs, <br />and required drilling equipment, including but not limited to the following: truck <br />mounted or skid mounted drill rig, air compressors and\or booster, rig-up truck, portable <br />water tanks, boom truck, utility trailer, drill pipe lay-down rack, and crew trucks. <br />Roads utilized in the project will be maintained with water bars and appropriate <br />sedimentation controls as required during the drilling phase. A D9 bulldozer or its <br />equivalent will be used to prepare the mad for travel and assist in mobilizing the drill <br />equipment to the drill sites. Additional equipment expected to be used in opening, <br />maintaining, and reclamation may include arobber-tired backhce, rubber tired grader, <br />roller compactor and attack-mounted excavator. <br />Brush removal may occur at the proposed drill sites however, if trees are encountered, <br />MCC will remove the trees. A drill pad site of approximately 80 ft. x 212 ft. will be <br />constructed to accommodate the drill equipment and drill cuttings sump or mud pits, <br />Drill pads will be constructed only as lazge as necessary. <br />Topsoil will be stripped, stockpiled, and identified with a sign. Stored topsoil will be <br />placed in a separate pile; the pile will be located outside of drainages and placed in an <br />area where it will be protected from wind erosion; signs identifying the pile as "Topsoil" <br />will be placed so as to prevent unintended contamination, compaction or use for other <br />than reclamation purposes; alternate sediment controls (slash, silt fence or straw wattles) <br />will be used; and the pile will be seeded in the first seeding season following its <br />construction using a seed mix that will stabilize emsioa This topsoil will be used in the <br />reclamation phase of the program. <br />Use of mud pits on or near the drill pad excavated in native soil. Mud pit dimensions <br />would be 25' x 25' x 8' to acwmmodate cuttings with 25% swell, the run-0ff associated <br />with a 0.5 acre drill pad and 10 yeaz, 24-hour storm event and 1-ft of freeboazd. Mud pit <br />designs and calculations for 1.0 foot of freeboard have been previously approved by the <br />