Laserfiche WebLink
• \ <br />Exhibit E - Reclamation Plan <br />Topaz ;tine - Pioneer Uravan, Inc. <br />Page 2 <br />The portal will be closed off by pulling the timbering and back fill- <br />ing with available barren rock previously brought to the surface. Erosion of <br />rock dump slopes is virtually non-existant due to the grid climate. The minor <br />amount of erosion which does occur will be controlled by s rategic placing of <br />rip rap material. <br /> <br />