My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE117069
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE117069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:12:49 PM
Creation date
11/25/2007 3:11:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998059
IBM Index Class Name
Permit File
Doc Date
9/15/1998
Doc Name
SUNNY DALE FARM PIT M-98-059 PERMIT ISSUANCE CONSTRUCTION MATERIAL OPERATION
From
DMG
To
L AND L READY MIX
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.._ . ~, <br />-2- <br />u <br />2. The operation will not adversely affect the stability of any significant, valuable, and <br />permanent man-made structure located within two hundred feet ofthe Affected Land, except where there is an <br />agreement between the Operator and the persons having an interest in the structure that damage to the structure <br />is to be compensated for by the Permittce; and; <br />3. The proposed mining and reclamation operations can be carried out in conformance <br />with the requirements ofthe Act, and the Construction Material Rules and Regulations. <br />E. The Pem»ttee has made a showing satisfactory to the Board: 1) that it will employ, during and <br />after its underground mining and/or surface operations, procedures designed to minimize environmental <br />disturbance from such operation; 2) that it will provide for reclamation of the Affected Lands appropriate to the <br />subsequent beneficial use of such lands; and 3) that, in the event of the failure of its proposed reclamation plan, <br />it will take whatever measures may be necessary to assure the success of reclamation ofthe lands affected by <br />such operations in accordance with the Act. <br />F. A copy of the Pemuttee's application, as amended and supplemented, has been approved by the <br />Board and is, by this reference, incorporated herein. <br />G. The issuance of this permit does not relieve you from having to comply with all applicable <br />Federal, State and County statutes, including State water law. <br />GRANTS. CONDITIONS AND AGREEMENTS <br />The Board, in reliance upon the representations and promises made in the permit application, as <br />amended and supplemented, and the performance wartanty, hereby issues a life of the mine permit to the <br />Permittee, to engage in the operations described in the application on certain lands lying in the County of <br />Phillips, State ofColorado. These lands are described in the permit application, as amended and supplemented, <br />and are referred to herein as the "Affected Lands". <br />This permit is issued subject to the following conditions and agreements: <br />1) The Pertnittee will be bound by all applicable requirements ofthe Act, and all applicable rules <br />and regulations ofthe Board, as amended from time to time, the terms ofthe permit application, the terms ofthe <br />performance warranty, and the terms ofthe financial warranty filed with the Division. <br />2) The Pertnittee will file with the Division its annual report and fees on each anniversary date of <br />this permit. <br />3) [fanalyses ofthe mining and reclamation operation and the data collected through monitoring <br />and experimentation by the Permittce or monitoring by the Division indicate that the operation will not be able <br />to comply with the requirements of the Act and applicable rules and regulations of the Board, the Permittee <br />hereby agrees to exercise its best efTorts, after consulting with the Division, to modify the plans to correct such <br />deficiencies in the future. Such modifications may require tcehnical revisions or amendments to the permit. <br />4) The Board, or its authorized representative may enter upon the lands ofthe permitted operation <br />at all reasonable times for the purpose of inspection to determine whether the provisions ofthe Act, Rules and <br />Regulations, and permit have been complied with pursuant to C.R.S. 34-32.5-121. <br />
The URL can be used to link to this page
Your browser does not support the video tag.