Laserfiche WebLink
' USE OF ADJACENT LAND <br /> <br />The maximum extent of flow of dumped material during cloudburst, ~ <br />i <br />etc. is expected to cease approximately 400 feet from the property <br />line. Extent of the material as dumped will be about 800 feet from <br />the property. <br />WILDLIFE AND DO"fESTIC ANIMALS <br />Creation of the dump will not effect the migration routes or use <br />patterns for wildlife. No attractions should exist that would bring <br />wildlife to the area. Existing vegetation will be altered. Return <br />of the area to its original vegetal growth is covered in the Rehabil- <br />itation Plan. <br />TP.UCK & AUTO TRAFFIC <br />The dump will not create any additional auto or truck traffic in <br />the area, <br />EI•LpLOYMENT <br />There will be no increzse in employment due to construction of <br />the dump, <br />DISTANCE FROM ABUTTING PROPERTY <br />The toe of the pile will be approximately 800 feet from the nearest <br />abutting property. <br />VISUAL IMPACT <br />The dump is located 13.2 miles from DeBeque, 7 miles from the <br />county road on Roan Creek. The area is not visible from any <br />existing public access roads, hiking trails, etc. <br />INDUSTRIAL PERFORMANCE STANDARDS <br />Volume of Sound - The volume of sound generated by equipment <br />used to build the pile cai11 be from 30 to 50 decibels. This <br />should be the only sound inherent to the construction and <br />maintenance of the area. <br /> <br />,I <br />Vibration- No vibrations will eminate beyond property lines. <br />