Laserfiche WebLink
EXHIBIT L <br />FECLAP~ATION COST; <br />Financial warranty will be supplied to the Board under <br />34-32-117(3)(a)(V)(A & B) C.R.S. 1973 Rev. Initially the operator <br />will submit either a corporate surety bond or a certificate of <br />deposit in the amount of $4,700. <br />In compliance with 39-32-117(4)(a ~C b), C.R.S. 1973 Rev. the <br />operator is furnishing the estimated cost of reclamation for each <br />of the first seven years. The number of acres to be disturbed each <br />year may vary considerably; estimates are based on a normal year <br />(neither bust nor boom). <br />Rec l ttOl,Tj,i on ~tEG15.~..lIILLC_~Q~ <br />13~e.7Leg~t4Sin~_13encb.f91'_ell Per Acre <br />Respreading soil and/or spoil <br />(1 acre x 43560 x 1 ft)/27=1614 yds/ac x $.86/ycl $1,388.00 <br />Seeding 14.2#/ac @ $4.00 56.80 <br />(for south-fucing slopes; north-facing will cost less) <br />Fertilizing 200Y ( $10/1004 <br />(assumed high; actual will depend on soil analysis <br />and amount of chip mulch) <br />Labor for seed broadcasting & fertilizing, <br />8 hrs/ac @ $13.00/hr <br />Labor, other, 16 man hrs/ac @ $6.50/tir <br />Trees and shrubs, 200 bareroot @ $24.00/100 <br />60 potted @ $19.00/30 <br />TOTAL PER ACRE TO REVEGETATE BENCH AREAS <br />Floor__and_Rga_d area <br />Grading and shaping, 4 hrs C $60.00/hr <br />TOTAL PER ACRE TO GRADE AND SLOPE <br />Reclamat_j.OltSosts (b~ve~rl <br />32.00 <br />104.00 <br />104.00 <br />48.00 <br />38.00 <br />$1,770.80 <br />$ 240.00 <br />$ 240.00 <br />First Year: <br />Revegetate bench area, 2.32 ac @ $1,770.80=$4,108.26 <br />Floor and road area, 2.47 ac @ $240.00 = 592.80 <br />TOTAL BOTID, FIRST YEAP. $4,701.06 <br />Second Year: <br />Revegetate bench area, 1.16 ac @ $1,770.80=$2,054.13 <br />Floor and road area, 1.23 ac @ $240.00 = 295.20 $2,349.33 <br />Carry forward from first year: 4,701.06 <br />TOTAL L'CIvT,, liF.CO1~ i'EAR $7,050.39 <br />Third Year: <br />Revegetate bench area, 1.16 ac C $1,770.F•0=$2,054.13 <br />Floor and road area, 1.24 ac @ 5240.00 = 297.60 $2,351.73 <br />Carry forward from second year: 7,050.39 <br />TOTAL BOND, THIRD YEAR $9,402.12 <br />37 <br />