Laserfiche WebLink
of health for an emission permit for both the pit and the <br />processing plant will be made before mining activity begins. <br />Mining activity is not expected to directly affect surfnce or <br />groundwater systems. Water necessary for dust control vrill be <br />hauled to the site. This is a dry operation; therefore, no PiPDES <br />permit will be required. <br />As more mine floor urea is opened up, it is planned that <br />several related plant activities will be installed, such as a <br />concrete plant, an asphalt plant and possibly a casting operation. <br />The 160-foot berm will create a very good shield for these types <br />of activities. <br />MINING TIMETABLE <br />Stage Years Total Acres Mined <br /> Acres <br />1 3-5 19.16 18.49 <br />2 35-45 72.97 68.91 <br />K' 0 9.75 0.00 <br />S 0 25.12 0.00 <br />Stages W and S are areas on the west and south that are <br />undistubed buffer area. <br />13 <br />