Laserfiche WebLink
<br /> <br /> <br />The total acreage being added to the permit is calculated as follows; <br />Water storage pond ""` -- 1 <br />Inlet-outlet easements <br />Plant site <br />Highway 93 access easement <br />Total <br />- ~.JTJ 6\. <br />~f W ~~n <br />- 2.001 ac ~ ~ s"" P°" <br />- 32.04 ac <br />- ,850 ac f <br />- 39.23 ac -~ y0~ <br />~ , ~..,~ <br />~(~ • ~: <br />If you would please calculate the additional application fee due to this acreage (39.23 AC) <br />and infa-m Martin Jones of WAI the fee will be paid. <br />The additional reclamation costs for these properties include the inlet and outlet easement <br />to the water storage pond and the Highway 93 access easement. The water storage pond <br />will remain after mining as a stock pond and, as per your agreement with WAI,. the plant <br />site will not be reclaimed. It will be used for other purposes after mining. The reclamation <br />costs for the additional areas are 2.85 acres x $2000/ac = $5700. <br />There is currently no document demonstrating the right of WAI to use the Highway 93 <br />access across the Hogan parcel. It has not been executed yet. This agreement is in the <br />process of being negotiated. <br />Please let me know if you have any questions with this transmittal. <br />Sincerely, <br />-' ~i,r-F <br />Paul Banks <br />PB/mkp <br />cr. Martin A. Jones, P.E. <br />Hydro-Search, I11C. HYDROLDGlSTS-GEOLOGISTS-ENGWEERS <br />