My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE116898
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE116898
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:12:40 PM
Creation date
11/25/2007 2:56:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200510912
IBM Index Class Name
Permit File
Doc Date
11/10/2005
Doc Name
Cost Estimate
From
DMG
To
Colowyo Coal Company, LP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : X04 <br />Date : 1 1/1 02 005 <br />User : JRS <br />State :Colorado Permitfjob# : C-1981-019 <br />County :Moffat Abbreviation :none <br />Site :Colowyo Mine Filename :C019-X04 <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action :Notice of Intent X-2005-109-12 <br />Task description :Replace Topsoil from Stoc <br />HOURLY EQUIPMENT COST <br />to Drill Pads <br />Basic machine : Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Shift basis : 1 perday <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $51.01 NA <br /> OperatingcosUhour : $93.55 100 <br /> Ripper op.cost/hour : $0.00 0 <br /> Operator cost hour : $31.78 NA <br /> Total unit cost hour : $176.34 Total fleet cosUhour : $176.34 <br />;: <br />MATERIAL QUANTITIES . _.... <br />Initial Swell Loose <br />volume : 14,300 BCY factor : 1.230 volume : 17,589 LCY <br /> <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />! t <br />HOURLY PRODUCTION <:: <br />Job Condition Correction Factors a: <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 1,243.2 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shiWday) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rfJ <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 °h (pos) Altitude : 0.95 (Cat HB) <br />Average site altitude : 7,800 feet Material weight : 1.10 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,100 IbslLCY Net correction : 0.47 <br />Weight description <br />Earth -Loam <br />Adjusted unit production : 581.83 LCY/hr <br />Adjusted fleet production : 581.83 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 30.23 Hours <br />Unit cost : $0.303 /LCY Total job cost : $5,331 <br />Horsepower : 405 <br />
The URL can be used to link to this page
Your browser does not support the video tag.