My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE116868
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE116868
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:12:39 PM
Creation date
11/25/2007 2:54:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981032
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
ANSWERS TO STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l~ <br />As shown in the Espey, Huston d Associates report (page c-34a and <br />appendix R of the permit applicat ion> the Nothern No. 1 Sedimentation <br />Pond is designed to contain the 10 year-24 hour storm. Also the <br />spillway was designed to safely pass the 25 year-24 hour event. <br />The amount the 12 inch gated spillway o. the Northern No. 1 <br />Sedimentation Pond must be opened to allow - automatic deuatering <br />with an average retention time of 24 hours i<_ ir~c hes <see attached <br />calculations>. <br />RFF IC ^ICPO L RRFR P I~~! <br />Rs shown in the Espey, Huston d Rssociates repc•rt (pages 13-1i ar~d <br />13-52 of the mine permit application) the Refuse L,~•~posal Sedimentatioi~ <br />• Pond is designed to contain the 10 Year-24 hc•1•r storm. Also th~r <br />spillway was designed t0 safely pass the 25 yezr-~' hour event. <br />The Refuse Disposal Rrea pond has an open 6 incl. :ron outlet pi; <br />This pond was evidently designed to autorr~etie: :, dewater with <br />average retention time of 24 hours. The quantity cf flow required <br />maintain an average retention time of 24 hours is 0.64 cubic feet <br />second (see attached calculations). The max imu rn flow through the <br />inch iron pipe using the Hazin-Williams Formula was found to be [ <br />cubic feet per second <see attached calculations). Therefore provic <br />an average retention time of approximately 28 hours. <br />Rs shown in Rppend ix D-2A3 d 4, Modification No. 2 of the per r~,:. <br />application and the Panorama Resource Services report of August !, ISL. <br />the Sedimentation Pond R was constructed to contain in excess of a IC <br />year-24 hour event. Rlso the spillway was designed to pass safely try <br />25 year-24 hour event. <br /> The amount the 12 inch gated spillway on the Rienau No. 2 Sedimentation <br /> Pend A rnU St be opened to allou for automatic deuatering with an average <br />• retention period of 24 hours is 1.5 inches <See attached calculations). <br />
The URL can be used to link to this page
Your browser does not support the video tag.