Laserfiche WebLink
Stipulation IJo. ?0 <br />THE PERP7ITTEE SHALL COMPLETE ALL RECLAMATIOi~ ACTIVITIES <br />AT T}]E 6JILS01d-LOUDY LOADOtIT SITE BY NOVEMBER 15, 1984. <br />'PHESE ACTIVITIES SHALL INCLUDE BUT NOT BE LIMITED TO <br />BACKFILLING AtdD GRADING, TOPSOILING, SEEDIIdG AND D1ULCHIIdG, <br />REMOVAL OF ACCUMULATED COAL, AND MAINTENANCE AND CON- <br />STRUCTION OF SEDIMENT CONTROL AND ROAD FACILITIES. <br />Northern Coal's Answer: <br />ALL RECLAI4ATION ACTIVITIES HAVE BEEN COMPLETED AT THE <br />YIILSON-LOUDY LOADOUT SITE. ALL ACCUMULATED COAL IJAS <br />REMOVED IN NOVEMBER OF 1983 (CMLRD INSPECTION DATED <br />NOVEMBER 3 ~ ~, 1983)• BACKFILLING, GRADING AND TOP- <br />SOILING WERE COMPLETED IN NOVEMBER OF 1984 (CMLRD <br />INSPECTION DATED NOVEMBER 1, 1984). SUBSEQUENTLY, <br />SEEDIIJG AIdD MULCHING WERE DONE AND SEDIMENT CONTROL <br />DEVICES INSTALLED. <br />• <br /> <br />l"!F'i; 5 <br />7i?cD LAi'!D Fl~CLA~;iAI!Di~S 61~lIS17i1 <br />;,ch. Dcp?. of i~!atural F;asocics <br /> <br />