Laserfiche WebLink
<br />Stipulation Id o. 10 <br />THE PERMITTEE MUST SUBMIT A REVISED VEGETATION PLAN TO <br />INCORPORATE THE MODIFICATIONS REQUESTED BY THE DIVISION <br />FOR SCHEDULED TIME FOR REVEGETATION, SEED MIXES, METHOD <br />OF APPLICATION, AND MULCHING. THIS PLAN MUST BE SUBMITTED <br />TO THE DIVISION WITHIN 60 DAYS OF PERMIT ISSUANCE. <br />Northern Coal's Answer: <br />Northern has altered its existing vegetation plan to <br />contain the revisions requested. A copy is included <br />here for reference. <br />All revegetation will take place during September 1 <br />to November 1 time period except if weather forces a <br />spring planting. The seed mixes have been changed as <br />requested. Any seed that is broadcasted will be <br />applied at twice the rates presented. Cover crops <br />will not be used as a form of mulch, and straw will <br />be applied at a rate of 3,000 lbs/acre. <br /> <br /> <br />