My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE116839
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE116839
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:12:37 PM
Creation date
11/25/2007 2:52:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002004
IBM Index Class Name
Permit File
Doc Date
4/18/2002
Doc Name
Comments from State Enginners Office and Letters from Concerned Citizens
From
DMG
To
GCC Rio Grande Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 <br />Phone (303) 866.3581 <br />FAX (303) 866-3589 <br />www.watecstate.co.us <br />of cow <br />RECEIVE® ~~' <br />°I <br />.. <br />MAR 2 Z 2002 `=,8,6=' <br />Division of Minerals and Geology <br />Response to Reclamation Permit Application Consideration <br />DATE: March 22, 2002 <br />TO: James C. Stevens, Senior Environmental Protection Specialist <br />CC: Division 2 Office; District 14 Water Commissioner <br />FROM: Don West, P.E. ~~ <br />RE: Red Rock Plant & Limestone Mine Pit, File No. M-2002-004 <br />Operator: GCC Rio Cnande, Inc., <br />Contact: Brian McGi11505/286-6026 <br />Section 13, Twp 225, Rng 64W, 6th P.M., Pueblo County <br />CONDITIONS FOR APPROVAL <br />Bill Owens <br />Governor <br />Greg E. Walther <br />Executive Director <br />Hal D. Simpson, P.E. <br />State Engineer <br />^ The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />® The proposed operation will consume ground water by: ^ evaporation, ®dust control, ^ <br />reclamation, ^ water removed in the mined product, ®processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gavel pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit azea. The applicant must then <br />obtain a waiver of objection from all well owners with wells within b00 feet of the permit area or <br />request a hearing before the State Engineer. <br />® Other: The applicant states that they have applied for three well permits to use 363.3 acre-feet/year <br />COMMENTS: The application did not cleazly state if water will also be removed in the mined product, if <br />evaporation will occur from ground water that is exposed, or if evaporation will occur from storm water that <br />remains on-site for more than 72 hours. These issues must be stated (if they apply) in the request for a water <br />supply plan or decreed plan for augmentation. <br />