|
<br />L J
<br />
<br />Pv."~L:r,
<br />I `.
<br />
<br />5
<br /> Location in A lication
<br />INFORMATION CATEGORY NARRATIVE MAPS
<br />2.04.711) Ground Water Information II.C; Mepe 2. 6, •Hydrolopy
<br /> 137 2.04.7141
<br />2.04.712) Surface Water Information II.C Ssa Above •Hydrolopy 2.04.714)
<br />2.04.713) Alternative Water Supply Information IV.F 9,10,15,22,
<br /> 52-56, 90,119
<br />2.04.8 Climatolo ical Information II.E N/A
<br />2.04.9 Soils Resource Information II.I; Ma s 6, 7 `Soils 2.04,91111c1
<br />2.04.10 Vegetation Information II.F; Maps `Vegetation
<br /> 9,10,129 2.04.10111
<br />2.04.11 Fish and Wildlife Resources Information II.G & II,H 124-127
<br />2.04.12 Prime Farmland Investi ation NIA
<br />2.05.2 Operation Plan: Estimated Area for Life of I 1, 2
<br />0 oration
<br />2.05.3 0 oration Plan: Permit Area I •Opsratlon Plan 2.05.3
<br />2.05.311) Production Methods and E ui moot III.A.2, III.A.4 119
<br />2.05.312) Operation Description III.A.3-III.A.6 1,z,67,78,11s,12o.1 zz
<br /> 131,132-133,137-139,
<br /> 161
<br />2.05.313) Mine Facilities IV.A, IV.H 12-18,23.27,35,63,64,
<br /> 87,88,86, 88,88,91,
<br /> 100.107,108,108-113,
<br /> 152
<br />2.05.314) Ponds, Impoundments and Diversions V.B 1s,2o-z7,zs-3z, 3a~4.
<br /> 46, 78-80A, 82,86, 90,
<br /> 91, 103.103A, 114,
<br /> 131, 138,140-143
<br />2.05.315) Topsoil (removal and storage) V.H 23-28,4346,52-55, 70-
<br /> 78,81,82,85,88,90
<br /> 92,105-113A,136,151
<br />2.05.316) Overburden NIA
<br />2.05.3171 Coal Handlin Structures IV,C 16,25,28,103, 106
<br />2.05.318) Coal Processing Waste and Non-Coal 111.6.3, IV.D 111.6.3: 76
<br />Processin Waste IV.D: None
<br />2.05.319) Return of Coal Processing Waste to V.E N/A
<br />Abandoned Workin s
<br />2.05.4 Reclamation Plan V.K 76
<br />2.05.41211a) Timetables II.A.3 119,120
<br />2.05.4 2 b Reclamation Cost Estimates V.K NIA
<br />
|