Laserfiche WebLink
• <br />~.OUI*, 2155 t?AGE 541 <br />the development permit; <br />il. The reseeding of each 3/4-acre phase should be finished within 6 months of <br />the completion of excavation in that phase to meet the requirement for a <br />timeframe for reclamation in Section 10.7.19; <br />12. The approved reclamation plan must be filed with the County Clerk and <br />Recorder as stipulated in Section 10.6.10. The reclamation plan should include <br />a proposal to control blowing topsoil from the spoils pile (proposed buffer) <br />located in Phase 8; <br />13. A 20-year timeframe to complete excavation of all B phases will be allowed <br />as proposed and to meet the requirement for a development timeline for the site <br />in Section 10.7.20; <br />14. Review agency requirements; <br />15. A permit must be obtained from the Bureau of Mined Land Reclamation prior <br />to the recording of the development permit; and <br />16. No blasting or crushing may occur and dust control will be practiced at all <br />times. <br />PASSED AND ADOPTED THIS 27th day of June, 1995. <br />ATTEST: <br />~' <br />eP• c°`~~h <br />f ~l <br /> <br /> <br />.I i. <br />` <br />' <br /> <br />~ :~.~ .. 4 <br />..r <br />` <br /> <br />q`~ S ••~ <br />2FL <br />J <br />hl~~~ <br />~ <br />\~ s <br />~~ <br />lli . <br />. <br />L o ~a P <br />~° <br />Doralya~t'Genova, Chairman <br />Boa of Mesa County Commissioners <br />County Clerk <br />