My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE116733
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE116733
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:12:31 PM
Creation date
11/25/2007 2:42:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004A
IBM Index Class Name
Permit File
Doc Date
5/13/2002
Section_Exhibit Name
APPENDIX B
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT I IG(b) <br />• <br />Name to whom violation was issued Lodestar Enerev. Inc. <br />Perntit (or other identifying) No. <br />MSHA No. 13-17G60 Date MSHA No. issued 4/21/95 <br />Violation (.D. No. 41-13! 1 <br />Issuing regulatory authority Department for Surface Alining Reclamation <br />and Enforcement, S~at° of Kentucly <br />Date Violation issued 6/17/98 <br />Description of alleged violation I . Slide ofi-access Road "B" approx. '/: acre in size, on <br />Permit on Inc. #l. 2. Rills and sullies along with some hiehwall slumoaee has occurred on <br />Inc. #5 Rt 7. 3. Company has failed to use Hollowfdl #4 within last year, no grade work <br />completed, etc. on Inc. #6 4. Two off-permit slides have occurred on Inc. #5, '/, acre <br />5. Ponds 7, 9 & 12 have reached cleanou[ stage, ES W has wash out of these along with DO <br />#21. Also, no sediment control on slides. <br />Abatement actions taken 1. Work slide area down, divert drainage away from slide, seed & <br />mulch. 2. Repair rills, gullies and highwall stumpage by regrading, seed and mulch. <br />3. Construct HF #4 according to plans, place side drains, etc., seed, mulch after final grade <br />work 4. Work both slides, seed, mulch, submit rivision [o add off-permit area within 60 _ <br />_ days. 5. Cleanout ponds and rework ES W, provides sediment control for slides. <br />Date of Abatement actions 10/20/98 <br />Type of Proceedings (Administrative or Judicial) N/A <br />Date of proceedings N/A <br />Status of proceedings ~ - N/A <br />Location of proceedings <br />Penalty Assessed NiA Date Paid N/A <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.