Laserfiche WebLink
<br />Mr. Gary Tuttle <br />January 15, 1998 <br />Page 2 <br />In options 2, 3 and 4, the operator must provide information <br />\ ~ regarding the permeability and geologic conditions of the <br />~( ~ underlying bedrock that the slurry wall will be keyed into and <br />\~,, would form the bottom of the reservoir. Pre-disturbance baseline <br />static water levels for the shallow groundwater such as from <br />drillers or geotechnical logs of the auger holes drilled across the <br />~, permit area and any other well information on or near the site <br />P currently available must be provided. <br />_, <br />\ Any of the above options must be submitted as a revision to the <br />permit and be approved by the DMG prior to exposing groundwater in <br />Phases 2 or 3. <br />