My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE116716
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE116716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:12:31 PM
Creation date
11/25/2007 2:40:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997058
IBM Index Class Name
Permit File
Doc Name
PERMIT APPROVAL WITH CONDITIONS BASELINE RESOURCE HALL IRWIN CONSTRUCTION CO FN M-97-058
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mr. Gary Tuttle <br />January 15, 1998 <br />Page 2 <br />In options 2, 3 and 4, the operator must provide information <br />\ ~ regarding the permeability and geologic conditions of the <br />~( ~ underlying bedrock that the slurry wall will be keyed into and <br />\~,, would form the bottom of the reservoir. Pre-disturbance baseline <br />static water levels for the shallow groundwater such as from <br />drillers or geotechnical logs of the auger holes drilled across the <br />~, permit area and any other well information on or near the site <br />P currently available must be provided. <br />_, <br />\ Any of the above options must be submitted as a revision to the <br />permit and be approved by the DMG prior to exposing groundwater in <br />Phases 2 or 3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.