Laserfiche WebLink
<br />III IIIIIIIIIIIIIIII <br />~ STATE ~ COLORADO <br />DI VISIUN OF MINERALS AND GEOLOGY <br />Doparlmenl 01 Natural Resources <br />I tl 4 Sherman A., Room 2t5 <br />Dcnvcr. Colorado AO?Ol <br />Phanr' 0011 Hfi6- S Sfi7 <br />FA% 141111 H1?-ri IUG <br />March 30, 1998 <br />Mr. Paul Coleman <br />P.C. Management, LLC <br />464 25.5 Road <br />Grand Junction, CO 81505 <br />Re: Flag Creek Mine, M-97-098, Permit Issuance -Construction Material Operation <br />Dear Mr. Coleman: <br />~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />fovernor <br />lames 5. Lochhead <br />E.~ecwire Dueclor <br />Michael B. Long <br />Division Director <br />On March 30, 1998 the Division of Minerals and Geology found P.C. Management, LLC to have satisfied <br />the applicable requirements of C.R.S. 34-32.5-101 et e~9. for obtaining a mining and reclamation permit. <br />Therefore, a permit is being issued. Two signed originals of the permit have been exectued. We have kept <br />one copy for our files and are enclosing one copy for your use. It is your responsibility to comply with all <br />of the terms of the permit. <br />l . All of the original application materials, as amended and supplemented, are an integral part of your <br />permit. They have been incorporated into the permit by reference. We presume that you have a copy of <br />all of these materials; therefore, none have been enclosed with this mailing. We suggest that you keep a <br />copy of the permit and the permit application at the mining operation as a reference for operating personnel, <br />to help ensure compliance with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those described in the permit may <br />require a modification to the permit. We suggest consulting the Construction Materials Rules and <br />Regulations andlor contac[ing us to determine if a revision to the permit is necessary. Rule 1.10 pertains <br />[o Amendmen[s, Rule 1.9 to Technical Revisions, and Rule 1.11 to Conversions. <br />3. On your permit anniversary date each year, March 30, you must submi[ an annual fee and an annual <br />report to us. The annual fee for this permit is $550.00. Please consult the Act, Rules and Regulations, and <br />your permit for specific annual report requirements applicable to your mine. <br />If you have any questions, please the contact the Division. <br />Sincere) <br />MICHAEL B. LONG <br />Division Director <br />MBL/TAS/BDC <br />Enclosure <br />cc: David Smuin, Hydro Terra <br />M~\OSS\BDCITEMNMAP'3098 TAS <br />