Laserfiche WebLink
~ N1 1111111111111111 ~ <br />STATE OF <br />COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Resources <br />I S I{ sherman 5L, Room ? I S <br /> <br />Denver, Colorado 7}020. ~~~~~ <br />Phnnu: 1)031 N56-156: ~ <br />r.4t IJO})N}?.810n <br /> DEP,gRTMENT OF <br /> NATURAL <br />October 1, 1998 RESOURCES <br />Mr. Jeff Gregg Roy Romer <br /> <br />Hall-Irwin Construction Company Governor <br /> <br />3026 4th Avenue Imes s. ranneaa <br />Execuooe D~reanr <br />P. 0. BOx ~ 19 M¢hael tl. long <br />Greeley. CO 80631 Dimsion DrteROr <br />Re: The Shores, Permit No. M-98-013, Permit Issuance -Construction Material Operation <br />Dear Mr. Gregg: <br />On October 1, 1998 the Division of Minerals and Geology found Hall-Irwin Construction Company to have satisfied <br />the applicable requirements of C.RS. 34-32.5-101 ~ 5gg. for obtaining a mining and reclamation permit. Therefore, <br />a pemvt is being issued. Two signed originals of the permit have been executed. We have kept one copy for our files <br />and are enclosing one copy for your use. It is your responsibility to wmply with all of the terms of the permit. <br />1. All of the original application materials, as amended and supplemented, are an integral part of your permit. They <br />have been incorporated into the permit by reference. We presume that you have a copy of all of these materials; <br />therefore, none have been enclosed with this mailing. We suggest that you keep a copy of the permit and the permit <br />application at the mining operation as a reference for operating personnel, to help ensure compliance with the terms of <br />the permit. <br />2. Changes in the mining and reclamation operations that differ from those described in the permit may require <br />a modification to the permit We suggest consulting the Construction Materials Rules and Regulations andlor contacting <br />us to determine if a revision to the permit is oecessarv. Rule I.10 pertains to Amendments, Rule 1.9 to Technical <br />Revisions, and Rule 1.1 l to Conversions. <br />3. On your permit anniversary date each year, October 1, you must submit an annual fee and an annual report to <br />us. The annual fee for this pemtit is $550.00. Please consult the Act, Rules and Regulations, and yotu permit for <br />specific annual report requirements applicable to your mine. <br />If you have any questions, please the contact the Iivision. <br />Sincer <br />MICHAEL B. LO <br />Division Director <br />MBL/'I'ASBDC <br />Enclosure <br />cc: Barb Brunt:, Rocky Mountain Consultants, Inc. <br />~7 `JSSBDC.TE~b1.V:5Ul ).T.~S <br />