Laserfiche WebLink
~r <br />The area will be fertilized with 40 lbs. of N (nitrogen) and 40 lbs. of P205 (phosphorus) <br />per acre. This will be done after seeding and mulching. No trees or shrubs will be <br />planted in this area, as they would not be compatible with the end use. The area will <br />be fenced to prevent grazing or trampling by livestock until seeding is established. <br />During the reseeding we will be in contact with the local Upper Huerfano Conservation <br />District for their recommendations on type of seeding and methods used. <br />There are no water sources such as lakes, streams, springs, stock water ponds, ditches, <br />reservoirs, and or aquifers on or around the proposed mining area. Therefore, we will <br />not be contaminating any of the natural resources on or around the proposed mining <br />area. <br />We do not believe that there are any endangered or threatened species known to exist <br />in a close proximity to the proposed mining area. Therefore, our proposed mining <br />operation should have little or no impact on the wildlife in the proposed area. <br />There will be no significant disturbances outside of the 9.5 acres that we require to <br />open this gravel pit. <br />RECLAMATION COSTS <br />This reclamation cost estimate is based on the assumption that there will be no more <br />than the 9.5 acres disturbed at any one time. It is also based on a worse case scenario <br />i,e., at a time when the greatest area will need some form of reclamation. At that time, <br />mining will be complete and we will have to re-spread the topsoil and re-vegetate 9.5 <br />acres. <br />We plan on revegetating, fertilizing, and mulching the land with the seed mixture <br />mentioned above in this exhibit. <br />Direct Costs <br />TASK DESCRIPTION MACHINE <br />USED NO. OF <br />MACHINES TASK <br />HOURS DIRECT <br />COST <br />S read subsoil overburden Bulldozer 1 32 4 480.00 <br />S read to soil Bulldozer 1 26 3 640.00 <br />Rip roads, parking areas, <br />stock ile locations Ripper 1 4 $560.00 <br />Rev etation Reve 1 22 4 825.00 <br />Mobilization/De-Mobilization Semi-truck 1 4 300.00 <br />SUBTOTALS = 88 13 805.00 <br />