My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE116578
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE116578
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:12:23 PM
Creation date
11/25/2007 2:30:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Permit File
Doc Date
3/2/1989
Section_Exhibit Name
APPENDIX III PIT DESIGN BLAST CONTROL MONITORING
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />I' <br />i <br />i <br />1 <br />1 <br />In practice a relationship between the delay interval and burden has bees Eouad to be. <br />1 millisec pez L9 to Z~ Et of burden <br />If the delay is too lom cut-offs/misfires may occur. <br />b) General Guidelines <br />o stemming - should not be less than the burden to wntain dyrock and prevea[ <br />back break <br />o charge heigh[ - should noc be less [han burden to give adequate explosve coverage <br />o beach height - should no[ be less than Z c burden to comply with stemming and <br />rharg' heigh[ requtremencs <br />o sub-drill - should be between 0.0 and OS c burden to prevent Kara toe <br />The logc behind these restrictions is t7lustrated is Fgure 4. <br />
The URL can be used to link to this page
Your browser does not support the video tag.