My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE116561
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE116561
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:12:23 PM
Creation date
11/25/2007 2:29:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992038
IBM Index Class Name
Permit File
Doc Date
3/25/1992
Doc Name
REGULAR OPERATION 112 RECLAMATION PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• -3- <br /> (riverbottom) <br />10. Primary future Cropland(CR) X Pastureland(PL) General Agriculture(GA) <br /> (Post-mining) _ <br />_ Rangeland(RL> _ Forestry(FR) _ Wildlife Habitat(WL> <br /> land use Residential(RS) Recreation(RC) Industrial/Commercial(IC> <br /> (check one): _ Developed Water Resources(WR) _ Solid Waste Disposal(WD) <br /> (riverbottom - no grass) <br />11. Primary rep sent Cropland(CR) X Pastureland(PL) General Agriculture(GA) <br /> land use _ <br />Forestry(FR) _ <br />Rangeland(RL) Wildlife Habitat(WL) <br /> (check one): _ <br />_ <br />Residential(RS) Recreatfon(RC> _ Industrial/Commercial(IC) <br /> _ Developed Water Resources(WR) <br />12. Method of Mining : _ Quarry (QR) _ Solution (SO> <br /> 12a. Other: Br iefly explain mining method (e.g. Placer, truck/shovel). <br /> Truck/ Shovel <br />13. On Site Processing: _ Solution (SO) _ Chemic al (CH) _ Thermal (TH) <br /> Wash sand wit h _ Heap Leach (HL) _ Vat Le ach (VL) <br /> water only. <br />14. Application Fee: <br /> The application fee for quarry mining is $2,325. <br /> the application fee for solution mining or any chemical o r thermal processing <br />• is $3,100. <br /> If none of these methods or processes are to be included in the operation then the <br /> application fee is $1,875. <br />An applicant will not be issued a reclamation permit until notified by the Division that <br />this application and the required performance and financial warranties have been <br />approved. Alternatively, an automatic approval will occur where the Division fails to <br />notify the applicant/operator that the application has been denied. The final agency <br />action must be made within 120 calendar days from the date the application was <br />submitted. However, the performance and financial warranties must be approved by the <br />Division or Board before a permit will be issued even if you receive an automatic <br />approval. NO MINING OPERATIONS SHALL BEGIN UNTIL A PERMIT IS ISSUED (Rule 7.2(2)). <br />It shall be a provision of this permit that the operations will be conducted in <br />accordance with the terms and conditions listed in your application, as well as with the <br />provisions of the Act and the Mineral Rules and Regulations in effect at the time the <br />permit is issued. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.