Laserfiche WebLink
<br />MINING PLAN <br />Tlie mining of sand on the affected property herein will be the <br />simplest of operations, utilizing a truck, shovel and loader <br />system. The sand will be taken from the ground, washed and loaded <br />for delivery. <br />It is the intent of the operators of the mining operation to <br />begin mining at the south end of the property and work their way <br />north, mining in an area consisting of approximately one acre each <br />time. <br />Tl~e mining operation will continue for a period of ten years <br />or until the supply of sand is exhausted. Upon completion of the <br />mining in each one acre section, these sections will be returned to <br />their original state of riverbottom by the completion of any <br />grading necessary to make such section level. <br />It is anticipated by the landowner and operators that the <br />depth of the sand will be approximately up to sixty feet. Since <br />this is a sand mining operation, no overburden will be involved. <br />• <br />• <br />