Laserfiche WebLink
<br />RECLAMATION COSTS <br /> <br /> <br />Total Area <br />Less Wet Area <br />Total To Be Planted <br />72.67 acres <br />10.00 acres <br />62.67 acres <br />Total Inundated 10.00 acres <br />Haul Road <br />Approximately ten feet (10') along each side to be seeded and mulched. <br />11 425' X 20' <br />Length = 43,560 = 5.246 acres <br />Plant Area <br />Total Area = 5 acres " ~ <br />Total Area To Be Seeded <br />Pit Area <br />Haul Road <br />Plant Area <br />TOTAL <br />62.670 acres <br />5.246 acres <br />5.000 acres <br />76.916 acres <br />Using Colorado Department of Highways 1984 Cost Data for contract <br />construction cost, the following yearly averages for landscaping related <br />contract items should approximate reclamation costs if done on a contract <br />basis: <br />Native Seeding @ 9.63 lb.-PLS <br />Fertilizer (Available N) @ 0.88 lb. <br />Fertilizer (Available P) @ 0.77 lb. <br />Mulching (Straw) @ 207.70 ton <br />Cost Per Acre <br />Native Seeding - 9.1 lbs/acre x 9.63 = $87.63 <br />Fertilizer (N) - 40.0 lbs/acre x 0.88 = 35.20 <br />Fertilizer (P) - 40.0 lbs/acre x 0.77 = 30.80 <br />Mulching - 2 ton s/acre x 207.70 = 415.40 <br />TOTAL COST PER ACRE $569.03 <br />