Doc Name
Weekly Const. Report
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />Phase IVb Weekly Summary No. 4 Page 3 003-2203 <br />Field Monitorine and Testine Activities <br />Golder observed construction activities associated with Phase IV earthworks. All conshuction <br />materials and soil materials placed were verified as suitable, and construction methods were in <br />accordance with project specifications. Removal of oversized and deleterious material from all fill <br />areas was observed. Golder observed Structural Fill (SF) placement in Phase N for materials, lift <br />thickness, moisture content, and compactive effort. <br />Golder observed placement of SLF and BF in Phase IVb for subgrade prepazation, thickness, <br />compaction, moisture content, and materials. Golder conducted eleven in-situ density and moisture <br />content tests to verify SLF placed complied with the specifications. Golder observed five depth <br />verification tests performed by Ames. <br />Golder observed and documented remediation activities associated with the Phase N underground <br />working construction. Workings were designated as "Shallow or Deep" as defined in the drawings. <br />Golder observed placement of CSB and CR for underground working remediaion. These materials <br />were placed in accordance with the drawings and specifications into excavated or open underground <br />workings. Golder previously obtained samples of SF, Select Structural Fill (SSF), CR, and Concrete <br />Plug (CP) for laboratory testing. Materials supp&ed met specifications. <br />Golder observed excavation of the geomembrane anchor trench for proper dimensions. <br />Golder observed geomembrane deployment, documenting ambient air temperature, panel <br />dimensions, seaming, tie-in overlap, and seam testing (trial seams, pressure, vacuum, and <br />destructive). Geomembrane placed in Phase IVb met specifications. <br />Golder observed and documented confirmation drilling activities associated with the Phase N <br />construction. Full-time monitoring was given to confirmation drilling of underground workings, <br />including logging holes, marking drill locations, surveying holes, and documenting underground <br />workings encountered. <br />Golder observed excavation of the LDT in Phase IVb for proper dimensions and slope. Excavation <br />met the requirements of the drawings. <br />Golder observed the placement of DCF in the Phase IVb azea. Golder had one CQA monitor per <br />dozer to observe DCF placement. <br />Laboratory Tests <br />Golder obtained one sample of Structural Fill (SFb-14) and one sample of Bedding Fill (BFb-02) for <br />laboratory testing. The samples tested met the requirements of the specifications and results aze <br />presented in Attachment B. <br />PhsseIV640tt13-26 doc Golder Associates Inc. <br />